Clean Max Rudra Wind-Solar Hybrid Power Project
Sector: Solar • Location: Rajkot, Gujarat, India
Source: Mercomindia.com
APAR Industries will procure hybrid captive power of 7.34 MW solar and 9.90 MVA from wind turbine generators from Clean Max Rudra, a special purpose vehicle of Clean Max Enviro Energy Solutions. The projects are located in Kalikanagar, Rajkot, Gujarat. APAR holds a 26% stake in the SPV, while Clean Max holds 74%. APAR has invested ₹113.8 million and will invest an additional ₹107.6 million in the
- Status
- Under Construction
- Sector
- Solar, Wind, Power Generation (CCGT)
- Location
- Rajkot, Gujarat, India
- Updated
- 22 Jul 2026
- Source
- Mercomindia.com
ConstructChat
Ask ConstructChat about Clean Max Rudra Wind-Solar Hybrid Power Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | under operation |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | APAR Industries will procure hybrid captive power of 7.34 MW solar and 9.90 MVA from wind turbine generators from Clean Max Rudra, a special purpose vehicle of Clean Max Enviro Energy Solutions. The projects are located in Kalikanagar, Rajkot, Gujarat. APAR holds a 26% stake in the SPV, while Clean Max holds 74%. APAR has invested ₹113.8 million and will invest an additional ₹107.6 million in the SPV. |
Original sector | Energy |
Budget |
Location
Country | India |
State | Gujarat |
City | Rajkot |
Source
Source | Mercomindia.com |
URL |
More Details
Record type | Project |
Sector | Solar, Wind, Power Generation (CCGT) |
Article published date | 2026-03-22 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
