CLEAN WATER ACT PROGRAM SUPPORT
Sector: Water Supply and Storage • Location: United States of America
Source: Grants.gov
SUMMARY OF WORK: The non-federal entity will perform the required program support to: (1) perform environmental analysis in support of the Clean Water Act program (Section 402 and 404); (2) perform field investigations at land disturbance sites relevant to sediment and erosion control operating requirements and develop environmental reports related to sediment and erosion control activities and th
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | archived |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | SUMMARY OF WORK: The non-federal entity will perform the required program support to: (1) perform environmental analysis in support of the Clean Water Act program (Section 402 and 404); (2) perform field investigations at land disturbance sites relevant to sediment and erosion control operating requirements and develop environmental reports related to sediment and erosion control activities and the related impacts to watersheds; (3) provide best management practice evaluations and recommendations that will assist in meeting Clean Water Act requirements; (4) provide Spill Prevention and Response Program field investigations and reporting; (5) provide Municipal Separate Storm Sewer System (MS4) field investigations and reporting; and (6) administrative functions, environmental reports, Geographic Information Systems and updates in support of the protection of water resources. BACKGROUND: Fort Leonard Wood currently consists of 61,410 acres and is designated as an active Installation Management Command (IMCOM) installation. Fort Leonard Wood is located just south of Waynesville and St. Robert, in Pulaski County, Missouri located in the northern Ozark Highland region of south-central Missouri. The installation encompasses 61,000 acres of primarily upland oak-hickory forest, 19/25 miles of permanent/intermittent streams, and 240 acres of impoundments that support an abundance of terrestrial and aquatic flora and fauna, including sensitive species.ELIGIBILITY REQUIREMENTS: All responsible, non-federal entities submitting funding requests that meet the requirements in the scope of work will be considered for this funding opportunity. STATUTORY AUTHORITY: Title 16 U.S.C. Section 670c-1 provides, in part, that “[t]he Secretary of a military department may enter into cooperative agreements…with nongovernmental organizations” for the purposes of “[t]he maintenance and improvement of natural resources on, or to benefit natural and historic research on, military installations and State-owned National Guard installations.” |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
More Water Supply and Storage projects in United States of America
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
- KITCEHN REMODEL, REPLACE CABINETS, WATER AND WASTE LINES REDIRECTED, NEW ELECTRICAL LINES FROM MAIN PANEL
- LAFCO PROCESS FOR NEW WATER CONNECTION ON COH WATER SERVICE
- BUILDING (A): MANUFACTURING/MANUFACTURING SUPPORT SPACE, BOILER REPLACE, WATER PURIFICATION SYSTEM, HVAC, 652 SF MAIN
