logo
ProjectProposed

Clean Water Infrastructure Project Phase 1

Proposed · Montana · Last reported Jun 2025

Source: Wastewater Digest

Construction of a new water transmission line in the town of Phillipsburg, Montana, to replace a recently failed 7-mile-long transmission main that connects the Fred Burr Reservoir to the town, ensuring clean and plentiful drinking water.

Status
Prospective
Sector
Water Supply and Storage, Government
Location
Phillipsburg, Montana, United States of America
Updated
22 Jul 2026
Source
Wastewater Digest

ConstructChat

Ask ConstructChat about Clean Water Infrastructure Project Phase 1

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Clean Water Infrastructure Project Phase 1” is an infrastructure initiative in the Water Supply and Storage sector, located in Phillipsburg, Montana, United States. Taiyo aggregates data on it from Wastewater Digest.

Participants

Sponsoring Agency

Status

Original status

Proposed

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Construction of a new water transmission line in the town of Phillipsburg, Montana, to replace a recently failed 7-mile-long transmission main that connects the Fred Burr Reservoir to the town, ensuring clean and plentiful drinking water.

Original sector

Water Infrastructure

Budget

Location

Country

United States of America (USA)

State

Montana

City

Phillipsburg

Source

Source

Wastewater Digest

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Government

Article published date

2025-06-08

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project