logo

Clean Wind Power (Devgarh) Private Limited

Sector: Wind • Location: India

Source: World Bank Group

Project
Active

Clean Wind Power (Devgarh) Private Limited (CWPPL), a Special Purpose Vehicle promoted by Hero Future Energies Private Limited (HFEPL, a Hero Group company) entered into an agreement with Rajasthan Government to develop a 37.5 MW wind farm located at Pratapgarh district of Rajasthan. The project was intended to be implemented as 51 MW (34 turbines of 1.5 MW) wind power project. However, Hero had d

Status
Prospective
Sector
Wind, Raw Materials, Power Generation (CCGT), Government, Automotive, Commercial
Location
India
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Clean Wind Power (Devgarh) Private Limited

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Clean Wind Power (Devgarh) Private Limited” is an infrastructure initiative in the Wind sector, located in India. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Company

Status

Original status

active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Clean Wind Power (Devgarh) Private Limited (CWPPL), a Special Purpose Vehicle promoted by Hero Future Energies Private Limited (HFEPL, a Hero Group company) entered into an agreement with Rajasthan Government to develop a 37.5 MW wind farm located at Pratapgarh district of Rajasthan. The project was intended to be implemented as 51 MW (34 turbines of 1.5 MW) wind power project. However, Hero had decided to short close the project to the capacity of 37.5 MW at the same location. The wind farm would involve the building of 25 Units of ReGen V-87 wind turbines (1.5MW capacity each). The electricity generated from the project would be evacuated by the Rajasthan state grid. CWPPL had entered into agreements with ReGen Powertech Limited to develop (including operation and maintenance of) this greenfield project. The Devgarh Wind farm was expected to sell the power to State distribution company through a 25-year PPA. The APPC (Average Power Purchase Cost) base tariff as per RERC prevailing tariff order for Jaisalmer district was US$ 0.087/kWh (INR 5.12 per unit @58.6 INR/USD) for the entire 25 years. The total capacity of 37.5 MW was eligible under REC as per the CERC and CDM benefits. Financial closure took place on 13th November 2014.The total project cost at the time of financial closure was US$ 20.6mn (INR 1257mn @61 INR/USD).The debt equity ratio for the project was about 60/40. Financing comprised of a 15-year term loan of US$ 12.3mn (INR 750mn) and sponsor equity of US$ 8.3mn (INR 507mn). The term loan was provided by IndusInd Bank Limited. The capital cost of INR33.5mn/MW is very much on the lower side for a 37.5MW. Again the date of financial closure doesn't seem consistent with commissioning date of March 2013. But further information on capital cost couldnot be ascertained at the time of collection of this information. We have assumed March 2013 as date of financial closure. The project was commissioned in March 2013.

Original sector

Energy

Budget

Location

Country

India

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Wind, Raw Materials, Power Generation (CCGT), Government, Automotive, Commercial

Article published date

2024-09-24

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project