CleanArc Data Centers Virginia Campus
Under construction · Virginia · Last reported Dec 2025
Source: GlobeNewswire
CleanArc Data Centers is developing a campus in Virginia that will eventually draw 900 MW of power, with the first 300 MW coming online in 2027, requiring utility-grade MEP installations.
- Status
- Under Construction
- Sector
- Power Transmission, Data Center, Power Generation (CCGT)
- Location
- Virginia, United States of America
- Updated
- 22 Jul 2026
- Source
- GlobeNewswire
ConstructChat
Ask ConstructChat about CleanArc Data Centers Virginia Campus
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | under construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | CleanArc Data Centers is developing a campus in Virginia that will eventually draw 900 MW of power, with the first 300 MW coming online in 2027, requiring utility-grade MEP installations. |
Original sector | Data Center Infrastructure |
Location
Country | United States of America (USA) |
State | Virginia |
Source
Source | GlobeNewswire |
URL |
More Details
Record type | Project |
Sector | Power Transmission, Data Center, Power Generation (CCGT) |
Article published date | 2025-12-18 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Transmission projects in USA
- Town Engineering Expansion
- Stack EFG - Utility Electrical Distribution
- East Campus Parking Deck Transformer Replacement
- Avenir SUA Maintenance Facility
- Alton PCD Amendment
- Repair of High Voltage Switch Box Bases
- Country Club Ranches Water Main Improvements Ph I
- Widen Turnpike SR 91 from Golden Glades Toll Plaza to the Broward County
