logo
ProjectEnded

CLEANING SOLUTION FOR POST-FIRE REMEDIATION - 100% ELIMINATION OF PAH

The status, timeline and source of this project. A free account opens every field.

Source: EU Funding & Tenders Portal

PER (Professional Engineering Restoration) is an Italian SME that performs recovery and renovation services after catastrophic events. In particular, much care must be placed after fires in order to eliminate dangerous Polycyclic Aromatic Hydrocarbons (PAH). With, PAHremov, targets the upgrade and industrialization of an innovative solution, composed by the integration off PER's x1 cleaning soluti

Status
Closed
Location
Italy
Updated
22 Jul 2026
Source
EU Funding & Tenders Portal

ConstructChat

Ask ConstructChat about CLEANING SOLUTION FOR POST-FIRE REMEDIATION - 100% ELIMINATION OF PAH

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “CLEANING SOLUTION FOR POST-FIRE REMEDIATION - 100% ELIMINATION OF PAH” is an infrastructure initiative, located in Italy. Taiyo aggregates data on it from EU Funding & Tenders Portal.

Participants

Not available for this record.

Status

Original status

ended

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

PER (Professional Engineering Restoration) is an Italian SME that performs recovery and renovation services after catastrophic events. In particular, much care must be placed after fires in order to eliminate dangerous Polycyclic Aromatic Hydrocarbons (PAH). With, PAHremov, targets the upgrade and industrialization of an innovative solution, composed by the integration off PER's x1 cleaning solution and a lipopectic biosurfactant, being able to reach 100% complete removal and ulterior total biodegradation of PAH in a secure and sustainable way, which will takes place much faster than using the current alternatives based on organic solutions and biosurfactants notably improving their PAH removal capacity and taking just 6-8 hours for total removal and biodegradation. In addition, the final solution is biodegradable and smaller disposal volumes are produced. These facts mean an improved site recovery, less waste (almost 98 % less weight) and an improved impact for the environment. PAHremov will directly reduce the costs of these decontamination activities by about 70%, allowing PER to intensify notably its international presence and increase its revenues. The payback for the estimated investment will be reached during the third year of commercialization of the PAHremov's based new service.

Location

Country

Italy

Source

Source

EU Funding & Tenders Portal

URL

More Details

Record type

Project

Article published date

2026-01-15

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project