CleanMax 16.83 MW Hybrid Renewable Energy Plant for Shell LNG Terminal
Sector: Solar • Location: Hazira, Gujarat, India
Source: Rediff MoneyWiz
CleanMax is developing a 16.83 MW hybrid renewable energy plant in Gujarat, comprising 6.93 MWp of solar and 9.90 MW of wind capacity. The project is implemented under the group-captive model to supply renewable power to Shell's LNG terminal at Hazira, designed to support energy-intensive operations and enhance supply stability and operational resilience.
- Status
- Under Construction
- Sector
- Solar, Power Generation (CCGT), LNG, Wind
- Location
- Hazira, Gujarat, India
- Updated
- 22 Jul 2026
- Source
- Rediff MoneyWiz
ConstructChat
Ask ConstructChat about CleanMax 16.83 MW Hybrid Renewable Energy Plant for Shell LNG Terminal
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | under construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | CleanMax is developing a 16.83 MW hybrid renewable energy plant in Gujarat, comprising 6.93 MWp of solar and 9.90 MW of wind capacity. The project is implemented under the group-captive model to supply renewable power to Shell's LNG terminal at Hazira, designed to support energy-intensive operations and enhance supply stability and operational resilience. |
Original sector | Energy |
Location
Country | India |
State | Gujarat |
City | Hazira |
Source
Source | Rediff MoneyWiz |
URL |
More Details
Record type | Project |
Sector | Solar, Power Generation (CCGT), LNG, Wind |
Article published date | 2026-04-24 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
