logo

Clear Fork Solar Project

Sector: Solar • Location: San Antonio, Texas, United States

Source: PV Magazine USA

Project
Under Construction

A 600 MW solar project near San Antonio, Texas, developed by Enbridge to power Meta's data center operations. The project is under construction and expected to be operational in summer 2027.

Status
Under Construction
Sector
Solar, Power Generation (CCGT), Data Center
Location
San Antonio, Texas, United States of America
Updated
22 Jul 2026
Source
PV Magazine USA

ConstructChat

Ask ConstructChat about Clear Fork Solar Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Clear Fork Solar Project” is an infrastructure initiative in the Solar sector, located in San Antonio, Texas, United States. Taiyo aggregates data on it from PV Magazine USA.

Participants

Company

Status

Original status

under construction

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

A 600 MW solar project near San Antonio, Texas, developed by Enbridge to power Meta's data center operations. The project is under construction and expected to be operational in summer 2027.

Original sector

Energy

Budget

Location

Country

United States of America (USA)

State

Texas

City

San Antonio

Source

Source

PV Magazine USA

URL

More Details

Record type

Project

Sector

Solar, Power Generation (CCGT), Data Center

Article published date

2025-09-16

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project