logo
ProjectBidding

Clearbrook Site Improvements

One of 8,613 projects Taiyo tracks in New Hampshire.

Source: Dodge

The project consists of drainage and sewer repairs/replacements, hydrant replacements, trash compactor pad and enclosure replacement, landscaping, roadway repair and paving. Phase 1 is to be completed during the 2025 construction season, utilizing the allowable contract time to achieve placement of the binder course or before November 1, 2025. A winter shut down will commence November 28, 2025 to

Status
Prospective
Sector
Water Supply and Storage, Commercial, Power Transmission, Waste Processing and Treatment, Power Generation (CCGT)
Location
Lincoln, New Hampshire, United States of America
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about Clearbrook Site Improvements

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Clearbrook Site Improvements” is an infrastructure initiative in the Water Supply and Storage sector, located in Lincoln, New Hampshire, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

Bidding

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The project consists of drainage and sewer repairs/replacements, hydrant replacements, trash compactor pad and enclosure replacement, landscaping, roadway repair and paving. Phase 1 is to be completed during the 2025 construction season, utilizing the allowable contract time to achieve placement of the binder course or before November 1, 2025. A winter shut down will commence November 28, 2025 to April 13, 2026. Phase 2 is to be completed in the 2026 construction season

Procurement method

Budget

Location

Country

United States of America (USA)

State

New Hampshire

City

Lincoln

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Commercial, Power Transmission, Waste Processing and Treatment, Power Generation (CCGT)

Article published date

2025-02-17

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project