Clearwater Cove WWTF Upgrades and Expansion
Sector: Water Supply and Storage • Location: Lampe, Missouri, United States of America
Source: Dodge
CWC is planning to expand its current facility to add space for an additional 100+ campers, leaders and support staff. The base bid includes modifications to the existing tank, demolition, site prep, concrete, fencing, setting the tanks, providing all mechanical, electrical, controls and plumbing. The contractor will be responsible for coordinating the startup of the equipment with YLCS and Fluenc
- Status
- Closed
- Sector
- Water Supply and Storage, Manufacturing (Industrial), Power Generation (CCGT), Waste Processing and Treatment, Cement, Commercial
- Location
- Lampe, Missouri, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Clearwater Cove WWTF Upgrades and Expansion
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | CWC is planning to expand its current facility to add space for an additional 100+ campers, leaders and support staff. The base bid includes modifications to the existing tank, demolition, site prep, concrete, fencing, setting the tanks, providing all mechanical, electrical, controls and plumbing. The contractor will be responsible for coordinating the startup of the equipment with YLCS and Fluence. The Titan MBR system will need to remain in operation until the new plant is operational. The ... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Missouri |
City | Lampe |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Manufacturing (Industrial), Power Generation (CCGT), Waste Processing and Treatment, Cement, Commercial |
Article published date | 2025-03-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
