logo

Clearwell Cover Replacement Backwash Pump Station

Sector: Water Supply and Storage • Location: Breaux Bridge, Louisiana, United States of America

Source: Dodge USA

Project
Closed

The work consists of construction of a new backwash/transfer pump station, installation of a new backwash/transfer pump, relocation of an existing backwash pump, demolition of the existing reinforced concrete clearwell cover and installation of a new geodetic dome cover, site piping, electrical and controls necessary to complete work as per plans and specifications.

Status
Closed
Sector
Water Supply and Storage, Government, Cement, Commercial, Bridge, Road, Power Generation (CCGT), Waste Processing and Treatment
Location
Breaux Bridge, Louisiana, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Clearwell Cover Replacement Backwash Pump Station

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Clearwell Cover Replacement Backwash Pump Station” is an infrastructure initiative in the Water Supply and Storage sector, located in Breaux Bridge, Louisiana, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The work consists of construction of a new backwash/transfer pump station, installation of a new backwash/transfer pump, relocation of an existing backwash pump, demolition of the existing reinforced concrete clearwell cover and installation of a new geodetic dome cover, site piping, electrical and controls necessary to complete work as per plans and specifications.

Procurement method

Budget

Location

Country

United States of America (USA)

State

Louisiana

City

Breaux Bridge

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Government, Cement, Commercial, Bridge, Road, Power Generation (CCGT), Waste Processing and Treatment

Article published date

2024-11-25

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project