logo
ProjectProject In Operation

Clem Jones Tunnel (CLEM7) PPP project

Sector: Road • Location: Australia

Source: InfraPPPWorld

Brisbane's Clem7 tunnel comprises 6.8 km tollway including a 4.8 km tunnel linking roads on each side of the Brisbane River.

Status
Under Construction
Sector
Road, Tunnel
Location
Australia
Updated
22 Jul 2026
Source
InfraPPPWorld

ConstructChat

Ask ConstructChat about Clem Jones Tunnel (CLEM7) PPP project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Clem Jones Tunnel (CLEM7) PPP project” is an infrastructure initiative in the Road sector, located in Australia. Taiyo aggregates data on it from InfraPPPWorld.

Participants

Not available for this record.

Status

Original status

project in operation

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Brisbane's Clem7 tunnel comprises 6.8 km tollway including a 4.8 km tunnel linking roads on each side of the Brisbane River.

Original sector

Transport

Procurement method

Budget

Location

Country

Australia

Source

Source

InfraPPPWorld

URL

More Details

Record type

Project

Sector

Road, Tunnel

Article published date

2025-02-24

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project