Clemesi Solar PV Plant
Sector: Power Generation (CCGT) • Location: Peru
Source: World Bank Group
This project comprises the construction of Clemesi solar PV plant with planned capacity of 122.6MW, located in Moquegua region, Peru. The project involves the installation of 200 thousand bifacial panels and is set to come online in 2023, injecting its power into Peru's national grid (SEIN). The sponsor is Enel Green Power and the total amount of the investment is $77.9 million. The construction s
- Status
- Prospective
- Sector
- Power Generation (CCGT), Solar, Water Supply and Storage, Hydro, Wind, Government
- Location
- Peru
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Clemesi Solar PV Plant
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency | |
Company |
Status
Original status | Active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This project comprises the construction of Clemesi solar PV plant with planned capacity of 122.6MW, located in Moquegua region, Peru. The project involves the installation of 200 thousand bifacial panels and is set to come online in 2023, injecting its power into Peru's national grid (SEIN). The sponsor is Enel Green Power and the total amount of the investment is $77.9 million. The construction start date is June 7, 2022. https://www.enel.pe/content/dam/enel-pe/medios/pdf/2022-06-03%20ENEL%20PER%C3%9A%20INICIA%20CONSTRUCCI%C3%93N%20DE%20WAYRA%20II%20Y%20CLEMES%C3%8D%20(ENG).pdf https://renewablesnow.com/news/enel-peru-installing-300-mw-of-new-wind-solar-787147/ https://www.ijglobal.com/articles/164855/enel-starts-clemes-construction |
Original sector | Energy |
Budget |
Location
Country | Peru |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Solar, Water Supply and Storage, Hydro, Wind, Government |
Article published date | 2024-09-23 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
