logo
ProjectPlanned

Cleveland's Largest Data Center Campus

The owner, status and timeline of this project. A free account opens every field.

Source: Cleveland Magazine

A proposed $1.6 billion, 150-megawatt data center campus consisting of three buildings on 35 acres near Slavic Village and the industrial valley in Cleveland. The campus is designed to be a state-of-the-art hyperscale facility supporting cloud, AI, and enterprise workloads, with advanced power, cooling, and fiber connectivity.

Status
Prospective
Sector
Power Generation (CCGT), Manufacturing (Industrial), Data Center
Location
Cleveland, Ohio, United States of America
Updated
22 Jul 2026
Source
Cleveland Magazine

ConstructChat

Ask ConstructChat about Cleveland's Largest Data Center Campus

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Cleveland's Largest Data Center Campus” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Cleveland, Ohio, United States. Taiyo aggregates data on it from Cleveland Magazine.

Participants

Not available for this record.

Status

Original status

planned

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

A proposed $1.6 billion, 150-megawatt data center campus consisting of three buildings on 35 acres near Slavic Village and the industrial valley in Cleveland. The campus is designed to be a state-of-the-art hyperscale facility supporting cloud, AI, and enterprise workloads, with advanced power, cooling, and fiber connectivity.

Original sector

Technology Infrastructure

Budget

Location

Country

United States of America (USA)

State

Ohio

City

Cleveland

Source

Source

Cleveland Magazine

URL

More Details

Record type

Project

Sector

Power Generation (CCGT), Manufacturing (Industrial), Data Center

Article published date

2026-05-09

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project