Clifford Avenue Drainage Improvements
Sector: Water Supply and Storage • Location: Waterford, New Jersey, United States of America
Source: Dodge USA
The proposed work generally includes 475 LF of storm chamber system construction, construction of an infiltration basin, 1 concrete headwall, 3 Type B inlets, 2 Type Double B inlets, 55 SY of concrete gutter, 500 LF of concrete curb, 150 LF of asphalt curb, 180 LF of 15 PCPP, 25 LF of 15 DIP, trench restoration, 1,400 SY of 2 thick pavement milling, 175 tons of 2 thick HMA9.5M64 bituminous surface
- Status
- Prospective
- Sector
- Water Supply and Storage, Cement, Road, Waste Processing and Treatment, Government, Commercial, Raw Materials, Manufacturing (Industrial)
- Location
- Waterford, New Jersey, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Clifford Avenue Drainage Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Design Development |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The proposed work generally includes 475 LF of storm chamber system construction, construction of an infiltration basin, 1 concrete headwall, 3 Type B inlets, 2 Type Double B inlets, 55 SY of concrete gutter, 500 LF of concrete curb, 150 LF of asphalt curb, 180 LF of 15 PCPP, 25 LF of 15 DIP, trench restoration, 1,400 SY of 2 thick pavement milling, 175 tons of 2 thick HMA9.5M64 bituminous surface course and related appurtenances |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | New Jersey |
City | Waterford |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Cement, Road, Waste Processing and Treatment, Government, Commercial, Raw Materials, Manufacturing (Industrial) |
Article published date | 2024-04-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
