Clifton Bridge Replacement
Sector: Bridge • Location: Penrith, United Kingdom
Source: Cision News
Skanska has signed a contract with Network Rail to replace the Clifton rail bridge near Penrith, UK. The project involves demolishing the existing bridge and constructing a new 130 meter single span steel structure, which will be installed over a 10-day period in January 2026. The project aims to reduce costs and carbon emissions by reusing existing bridge support structures.
- Status
- Under Construction
- Sector
- Bridge, Rail, Steel, Metal, Government
- Location
- Penrith, United Kingdom
- Updated
- 22 Jul 2026
- Source
- Cision News
ConstructChat
Ask ConstructChat about Clifton Bridge Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency | |
Company |
Status
Original status | Under Construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Skanska has signed a contract with Network Rail to replace the Clifton rail bridge near Penrith, UK. The project involves demolishing the existing bridge and constructing a new 130 meter single span steel structure, which will be installed over a 10-day period in January 2026. The project aims to reduce costs and carbon emissions by reusing existing bridge support structures. |
Budget |
Location
Country | United Kingdom (UK) |
City | Penrith |
Source
Source | Cision News |
URL |
More Details
Record type | Project |
Sector | Bridge, Rail, Steel, Metal, Government |
Article published date | 2025-04-13 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
