logo

Clifton Street Resurfacing

Sector: Power Transmission • Location: California, United States of America

Source: Riverside County

Project
Closed

Limits: Langlois Road to 600 feet west of Langlois Road Length: Approximately 600 feet District: 4 Community: Desert Edge

The County of Riverside Transportation Department is proposing to resurface approximately 600 feet of Clifton Street from Langlois Road to 600 feet west of Langlois Road. Clifton Street is classified as a Local Street in the County of Riverside’s General Plan. Clifton Street c

Project Information FAQ

Project Information

4 Q
The project “Clifton Street Resurfacing” is an infrastructure initiative in the Power Transmission sector, located in California, United States of America. Taiyo aggregates data on it from Riverside County.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Limits: Langlois Road to 600 feet west of Langlois Road Length: Approximately 600 feet District: 4 Community: Desert Edge The County of Riverside Transportation Department is proposing to resurface approximately 600 feet of Clifton Street from Langlois Road to 600 feet west of Langlois Road. Clifton Street is classified as a Local Street in the County of Riverside’s General Plan. Clifton Street currently ranges from 38-42 feet wide with curb/gutter along the south half of the roadway. The proposed project will include removing the roadway and placing back Hot Mix Asphalt (HMA). The proposed project will also include: Placement of safety edge and shoulder backing Utility adjustments Salvage/removal and installation of new signs No additional right-of-way will be required to construct the proposed improvements. The project improvements will remain within the existing footprint of the roadway.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data