Climate Change Adaptation Investments for the Resilience of Paramaribo
Sector: Water Supply and Storage • Location: Suriname
Source: Latin America and Caribbean Investment Facility (LACIF)
Paramaribo’s historic center was designated by the UNESCO as a World Heritage Site in 2002. Developed during the 16th and 17th centuries, it is considered an exceptional example of the fusion of European and indigenous South American culture, architecture, and construction techniques. This concentration of historical and cultural heritage buildings, monuments, and urban sites endows the area with
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | Obfuscated Data |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Paramaribo’s historic center was designated by the UNESCO as a World Heritage Site in 2002. Developed during the 16th and 17th centuries, it is considered an exceptional example of the fusion of European and indigenous South American culture, architecture, and construction techniques. This concentration of historical and cultural heritage buildings, monuments, and urban sites endows the area with the potential to lead the city’s sustainable development.However, the iconic site is in urgent need of protection against increased flooding caused by climate change. Flooding from the Suriname river occurs as sea level rises during spring tide, during tropical storms, and by the rainfall-induced accumulation of water. The frequency as well as the intensity and extent of flooding are expected to considerably increase, and the economic losses associated with a single flooding event with a 100-year return period are estimated at US$ 125 million. The reconstruction of a 220-meter-long flood wall currently in state of decay is very much needed to avoid this scenerario.This project seeks to reconstruct the flood wall and introduce a 220-meter-long pedestrian pathway along the river, rehabilitate a water taxi station, enhance the mangrove growth along the shoreline and provide training in integrated planning practices for climate adaptation. The pedestrian pathway has high recreational and economic value as it interconnects the Central Market, Waterfront tourism area, the Water Taxi station and a main bus hub. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
