Climate-friendly power transmission and supply

Sector: Geothermal • Location: Paraguay

Source: KFW Bank aus Verantwortung

Project
Active

Paraguay has a large supply of electricity generated by hydropower. The existing hydropower plants could in principle cover the country's current electricity needs three times over. However, due to the positive economic development, electricity demand is growing strongly (on average by almost 7.5% p.a.) and Paraguay has a deficit transmission network. The environmentally friendly hydropower electr

Project Information FAQ

Project Information

5 Q
The project “Climate-friendly power transmission and supply” is an infrastructure initiative in the Geothermal sector, located in Paraguay. Taiyo aggregates data on it from KFW Bank aus Verantwortung.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Paraguay has a large supply of electricity generated by hydropower. The existing hydropower plants could in principle cover the country's current electricity needs three times over. However, due to the positive economic development, electricity demand is growing strongly (on average by almost 7.5% p.a.) and Paraguay has a deficit transmission network. The environmentally friendly hydropower electricity cannot therefore be supplied to the consumption centers in the required quantities. Overloaded transmission and distribution lines lead to considerable technical and non-technical losses (up to 35%) as well as regular interruptions and failures in the electricity supply. Due to a lack of line capacity and the resulting high level of supply uncertainty, companies and private individuals currently have to operate diesel emergency generators in parallel and as a reserve. Against this background, the Paraguayan state-owned electricity supplier Administración Nacional De Electricidad (ANDE, borrower and project sponsor) has asked KfW for a development loan to expand the line network, transformers and distribution. The aim of the FC measure is to support Paraguay in maintaining its 100% renewable electricity generation matrix by avoiding the construction of thermal generation plants. This will be achieved by strengthening electricity transmission and distribution systems in western Paraguay in order to expand the use of existing hydropower resources and, in the long term, to integrate other renewable alternatives (especially solar) into the grid. This is intended to improve the transmission capacity and reliability of the electricity supply and to contribute to global environmental and climate protection.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data