Climate-friendly power transmission and supply

Sector: Geothermal • Location: Paraguay

Source: KFW Bank aus Verantwortung

Paraguay has a large supply of electricity generated by hydropower. The existing hydropower plants could in principle cover the country's current electricity needs three times over. However, due to the positive economic development, electricity demand is growing strongly (on average by almost 7.5% p.a.) and Paraguay has a deficit transmission network. The environmentally friendly hydropower electr

Status
Prospective
Sector
Geothermal, Hydro, Power Generation (CCGT), Power Transmission, Solar, Government, Water Supply and Storage
Location
Paraguay
Updated
19 Nov 2026
Source
KFW Bank aus Verantwortung

ConstructChat

Ask ConstructChat about Climate-friendly power transmission and supply

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Climate-friendly power transmission and supply” is an infrastructure initiative in the Geothermal sector, located in Paraguay. Taiyo aggregates data on it from KFW Bank aus Verantwortung.

Participants

Sponsoring Agency

Status

Original status

active

Taiyo status

Prospective

Taiyo last update

2026-11-19

Contact

Not available for this record.

Description

Description

Paraguay has a large supply of electricity generated by hydropower. The existing hydropower plants could in principle cover the country's current electricity needs three times over. However, due to the positive economic development, electricity demand is growing strongly (on average by almost 7.5% p.a.) and Paraguay has a deficit transmission network. The environmentally friendly hydropower electricity cannot therefore be supplied to the consumption centers in the required quantities. Overloaded transmission and distribution lines lead to considerable technical and non-technical losses (up to 35%) as well as regular interruptions and failures in the electricity supply. Due to a lack of line capacity and the resulting high level of supply uncertainty, companies and private individuals currently have to operate diesel emergency generators in parallel and as a reserve. Against this background, the Paraguayan state-owned electricity supplier Administración Nacional De Electricidad (ANDE, borrower and project sponsor) has asked KfW for a development loan to expand the line network, transformers and distribution. The aim of the FC measure is to support Paraguay in maintaining its 100% renewable electricity generation matrix by avoiding the construction of thermal generation plants. This will be achieved by strengthening electricity transmission and distribution systems in western Paraguay in order to expand the use of existing hydropower resources and, in the long term, to integrate other renewable alternatives (especially solar) into the grid. This is intended to improve the transmission capacity and reliability of the electricity supply and to contribute to global environmental and climate protection.

Budget

Location

Country

Paraguay

Source

Source

KFW Bank aus Verantwortung

URL

More Details

Record type

Project

Sector

Geothermal, Hydro, Power Generation (CCGT), Power Transmission, Solar, Government, Water Supply and Storage

Article published date

2024-05-03

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details