Climate Resilient Infrastructure
Sector: Road • Location: Belize
Source: World Bank Group
The objectives of the Climate Resilient Infrastructure Project for Belize are: (a) to enhance the resilience of road infrastructure against flood risk and impacts of climate change; and (b) to improve the borrower's capacity to respond promptly and effectively in an eligible crisis or emergency, as required. The project has four components. (1) Climate resilient infrastructure component will reduc
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The objectives of the Climate Resilient Infrastructure Project for Belize are: (a) to enhance the resilience of road infrastructure against flood risk and impacts of climate change; and (b) to improve the borrower's capacity to respond promptly and effectively in an eligible crisis or emergency, as required. The project has four components. (1) Climate resilient infrastructure component will reduce physical vulnerability of critical infrastructure through the retrofitting and rehabilitation of existing infrastructure within the primary and secondary road network including associated drainage and flood mitigation systems in order to strengthen their resilience to natural hazards and the anticipated impacts of climate variability. (2) Technical assistance for improved climate resilience management component will strengthen the capacity of relevant technical line ministries, Ministry of Works and Transport (MoWT) and Ministry of Natural Resources and Agriculture (MNRA), to mainstream climate resilience considerations into core physical and investment planning and asset maintenance. The component will strengthen the capacity available to the MNRA and MoWT through targeted training, as well as equipment and knowledge acquisition. (3) Project management and implementation support component will support: (a) strengthening the project management unit and line ministries, through staffing, training, and operating costs; (b) preparation of project reports; (c) procurement and financial management; (d) coordination of participating line ministries; (e) compliance with social and environmental safeguards; (f) training of staff in project management and implementation technical support; (g) monitoring and evaluation of project progress and results; and (h) related activities to support efficient project management and implementation, through the provision of training, operating costs, and acquisition of goods. (4) Contingent emergency response component will provide support for immediate response to an eligible crisis or emergency, as needed. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
More Road projects in Belize
- Establishing a Joint Venture/Other/Processing and preserving of fruit and vegetables/Naledo Belize Ltd
- Final Designs for George Price Highway Rehabilitation
- Belize Electricity Limited's Climate Mitigation Program
- Rehabilitation of the Southern Highway
- Design and Preparation of Sustainable Development Plan for the Caracol Region
- Emergency Road Rehabilitation Program Flooding Tropical Depression
- Tourism Development
- SOCIAL INVESTMENT FUND
