Climate-Resilient Omchhu River Basin Project
Sector: Water Supply and Storage • Location: Bhutan
Source: Asian Development Bank (ADB)
The proposed Climate-Resilient Omchhu River Basin Project will tackle one of the critical economic development inhibitors of the Phuentsholing area: recurrent flood risk from the Omchhu River exacerbated by unpredictable erosion of its riverbanks, landslides from its upstream hilly slopes, and worsening climate impacts. The project will (i) comprise the Omchhu River in Phuentsholing and its upstre
- Status
- Prospective
- Sector
- Water Supply and Storage, Residential, Raw Materials, Commercial, Government, Hydro
- Location
- Bhutan
- Updated
- 19 Nov 2026
- Source
- Asian Development Bank (ADB)
ConstructChat
Ask ConstructChat about Climate-Resilient Omchhu River Basin Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | proposed |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | The proposed Climate-Resilient Omchhu River Basin Project will tackle one of the critical economic development inhibitors of the Phuentsholing area: recurrent flood risk from the Omchhu River exacerbated by unpredictable erosion of its riverbanks, landslides from its upstream hilly slopes, and worsening climate impacts. The project will (i) comprise the Omchhu River in Phuentsholing and its upstream basin, (ii) focus on climate and disaster resilience through an integrated river basin approach to flood and erosion risk management, and (iii) combine structural and nonstructural measures. It will (i) design and build climate-resilient riverbank protection and flood embankment in four priority river reaches, and pilot landslide mitigation measures; (ii) develop holistic measures to reduce landslide debris flows and sediment-related risks; and (iii) strengthen institutional capacity to assess, map, and disseminate multi-hazard risks, including from the gender equality and social inclusion perspective; enabling better land-use planning and management on risk-sensitive land; investigating geological and geotechnical conditions; monitoring and mitigating risks; and enhancing the forecasting and early warning systems and disaster preparedness. The project will benefit about 9,300 people and ultimately enable riverfront development. The executing agency will be the Phuentsholing Thromde, and the implementation period will be 6 years from October 2025.Phuentsholing Thromde (municipality) (PT) will be the executing and implementing agency of the project, including for implementing works within the Dungkhag Administration (DA) administrative boundary. PT will be responsible for all procurement activities (works, goods and services). |
Original sector | Agriculture, natural resources and rural development |
Procurement method | |
Budget |
Location
Country | Bhutan |
Source
Source | Asian Development Bank (ADB) |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Residential, Raw Materials, Commercial, Government, Hydro |
Article published date | 2025-06-24 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in Bhutan
- Mangdechhu Hydroelectric Project Bhutan
- Supporting Health System Strengthening and Health Sector Reforms
- Hazelnut Value Chain Development Project
- Urban Centers Water Supply and Sanitation Program
- Manpower Development and Training
- Irrigation Rehabilitation
- Chirang Hill Irrigation Project
- Promoting Energy Exports Diversification Project
