logo
ProjectProposed

Climate-Resilient Omchhu River Basin Project

Proposed · Bhutan

Source: Asian Development Bank (ADB)

The proposed Climate-Resilient Omchhu River Basin Project will tackle one of the critical economic development inhibitors of the Phuentsholing area: recurrent flood risk from the Omchhu River exacerbated by unpredictable erosion of its riverbanks, landslides from its upstream hilly slopes, and worsening climate impacts. The project will (i) comprise the Omchhu River in Phuentsholing and its upstre

Status
Prospective
Sector
Water Supply and Storage, Residential, Raw Materials, Commercial, Government, Hydro
Location
Bhutan
Updated
22 Jul 2026
Source
Asian Development Bank (ADB)

ConstructChat

Ask ConstructChat about Climate-Resilient Omchhu River Basin Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Climate-Resilient Omchhu River Basin Project” is an infrastructure initiative in the Water Supply and Storage sector, located in Bhutan. Taiyo aggregates data on it from Asian Development Bank (ADB).

Participants

Sponsoring Agency

Status

Original status

proposed

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The proposed Climate-Resilient Omchhu River Basin Project will tackle one of the critical economic development inhibitors of the Phuentsholing area: recurrent flood risk from the Omchhu River exacerbated by unpredictable erosion of its riverbanks, landslides from its upstream hilly slopes, and worsening climate impacts. The project will (i) comprise the Omchhu River in Phuentsholing and its upstream basin, (ii) focus on climate and disaster resilience through an integrated river basin approach to flood and erosion risk management, and (iii) combine structural and nonstructural measures. It will (i) design and build climate-resilient riverbank protection and flood embankment in four priority river reaches, and pilot landslide mitigation measures; (ii) develop holistic measures to reduce landslide debris flows and sediment-related risks; and (iii) strengthen institutional capacity to assess, map, and disseminate multi-hazard risks, including from the gender equality and social inclusion perspective; enabling better land-use planning and management on risk-sensitive land; investigating geological and geotechnical conditions; monitoring and mitigating risks; and enhancing the forecasting and early warning systems and disaster preparedness. The project will benefit about 9,300 people and ultimately enable riverfront development. The executing agency will be the Phuentsholing Thromde, and the implementation period will be 6 years from October 2025.Phuentsholing Thromde (municipality) (PT) will be the executing and implementing agency of the project, including for implementing works within the Dungkhag Administration (DA) administrative boundary. PT will be responsible for all procurement activities (works, goods and services).

Original sector

Agriculture, natural resources and rural development

Procurement method

Budget

Location

Country

Bhutan

Source

Source

Asian Development Bank (ADB)

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Residential, Raw Materials, Commercial, Government, Hydro

Article published date

2025-06-24

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project