logo
ProjectOngoing

Climate-robust water management

One of 5,541 projects Taiyo tracks in Netherlands.

Source: Keep.EU

As a result of climate change, the weather in recent years has become increasingly extreme and bottlenecks in the border region are becoming more visible. The more extreme weather on both sides of the border is increasingly causing flooding, salinisation and drought. However, finding a solution to the water problem does not stop at the border. Taking measures on one side of the border can result i

Status
Under Construction
Sector
Water Supply and Storage, Government, Manufacturing (Industrial), Waste Processing and Treatment
Location
Netherlands
Updated
22 Jul 2026
Source
Keep.EU

ConstructChat

Ask ConstructChat about Climate-robust water management

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Climate-robust water management” is an infrastructure initiative in the Water Supply and Storage sector, located in Netherlands. Taiyo aggregates data on it from Keep.EU.

Participants

Sponsoring Agency

Status

Original status

ongoing

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

As a result of climate change, the weather in recent years has become increasingly extreme and bottlenecks in the border region are becoming more visible. The more extreme weather on both sides of the border is increasingly causing flooding, salinisation and drought. However, finding a solution to the water problem does not stop at the border. Taking measures on one side of the border can result in greater water problems on the other side of the border. It is therefore necessary to take joint action, share knowledge and coordinate infrastructure. A climate-robust water system on both sides of the canal from Ghent to Terneuzen With this in mind, the project focuses on setting up the water system of Othene (NL), Langelede (VL), de Poel (NL) and Vogelschorpolder (NL) in the vicinity of the Ghent-Terneuzen canal. Two mills are built and the water systems are adapted to improve water drainage and freshwater distribution in the border region. There are also numerous adjustments so that, among other things, fish can pass better. In addition, the optimal level management in the border region is investigated to achieve future-proof water management, and to coordinate this together with remotely controlled propulsion and grounding.

Budget

Location

Country

Netherlands

Source

Source reliability

Medium

Source

Keep.EU

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Government, Manufacturing (Industrial), Waste Processing and Treatment

Article published date

2023-08-12

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project