Clinton - Fiber Cable Relocation
Closed · Iowa · Last reported Aug 2025
Source: Dodge
ICN requires relocation of existing 4 fiber cable along N Bluff from N 6th St to Springdale Dr in Clinton, IA. Relocation will consist of placement of approximately 970-ft of minimum of 1.25-in HDPE. Contractor will place a total of two (2) handholes with lids set at grade. A new 48-strand OSP armored fiber optic cable shall be placed through the new conduit and coiled evenly in both handholes. Ex
- Status
- Closed
- Sector
- Telecommunications, Broadband, Manufacturing (Industrial), Commercial
- Location
- Clinton, Iowa, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Clinton - Fiber Cable Relocation
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | ICN requires relocation of existing 4 fiber cable along N Bluff from N 6th St to Springdale Dr in Clinton, IA. Relocation will consist of placement of approximately 970-ft of minimum of 1.25-in HDPE. Contractor will place a total of two (2) handholes with lids set at grade. A new 48-strand OSP armored fiber optic cable shall be placed through the new conduit and coiled evenly in both handholes. Existing ICN handhole at N Bluff Blvd/Springdale Dr will need to be removed after both IRHTP and Se... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Iowa |
City | Clinton |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Telecommunications, Broadband, Manufacturing (Industrial), Commercial |
Article published date | 2025-09-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Telecommunications projects in United States of America
- ATLANTA STREETCAR EAST EXTENSION FROM JACKSON ST TO IRWIN ST
- PAULDING COUNTY ITS SYSTEM EXPANSION - PHASE II
- UPGRADE (E) WIRELESS TELECOMMUNICATIONS FACILITY.ADD 2 ANTENNAS ADD 3 RRU'S ADD 1 OVP SURGE PROTECTOR ADD 1 HYBRID
- INSTALLATION OF A NEW SMALL CELL WIRELESS FACILITY IN THE PUBLIC RIGHT OF WAY
- REMOVE AND REPLACE NEW WIRELESS ANTENNAS AND RELATED EQUIPMENT
- INSTALL 1 FLAGPOLE,6 ANTENNAS,1 RADOME,3 POWER CABLES,3 HYBR D CABLES,JUMPERS FROM RRUS TO ANTENNAS,NEW 10'X10'LEASE..SEE
- DISH WIRELESS COLLOCATION ONTO EXISTING WIRELESS FACILITY AND GROUND BASE STATION
- COLLOCATION OF (3)NEW ANTENNAS & ASSOCIATED CABLES & EQUIPMT PER ATTACHED SCOPE OF WORK. 6904 COMPLIANT AT&T (E)CELL SITE
