logo

Clinton & West Avenues Water Main Replacement

Sector: Water Supply and Storage • Location: Fresno, California, United States of America

Source: Dodge

Project
Bidding

The scope of work includes but is not limited to; replacement of 11,700-linear feet of 8-inch and 6,200-linear feet of 12-inch water mains that have outlived their life expectancy with 8-inch polyvinyl chloride mains and 6,200-linear feet of 16-inch ductile iron water mains as well as the transfer of approximately 218 water services for providing a more reliable water service and fire protection.

Status
Prospective
Sector
Water Supply and Storage, Commercial, Waste Processing and Treatment, Government, Metal, Steel
Location
Fresno, California, United States of America
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about Clinton & West Avenues Water Main Replacement

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Clinton & West Avenues Water Main Replacement” is an infrastructure initiative in the Water Supply and Storage sector, located in Fresno, California, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

Bidding

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The scope of work includes but is not limited to; replacement of 11,700-linear feet of 8-inch and 6,200-linear feet of 12-inch water mains that have outlived their life expectancy with 8-inch polyvinyl chloride mains and 6,200-linear feet of 16-inch ductile iron water mains as well as the transfer of approximately 218 water services for providing a more reliable water service and fire protection.

Procurement method

Budget

Location

Country

United States of America (USA)

State

California

City

Fresno

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Commercial, Waste Processing and Treatment, Government, Metal, Steel

Article published date

2025-02-17

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project