Clip Group Project
Sector: Electric Vehicles (EVs) • Location: Poland
Source: European Bank for Reconstruction and Development (EBRD)
The EBRD (the "Bank") is providing a loan of approx. EUR 35 million of committed facility and potentially up to EUR 18 million of uncommitted term facility to CLIP Logistyka sp. z o.o., STS Logistic sp. z o.o. and CLIP Terminals sp. z o.o. (together, the "Borrowers"), part of CLIP Group S.A. (the "Group"), one of the largest privately owned logistics groups in Poland and the Central and Eastern E
- Status
- Under Construction
- Sector
- Electric Vehicles (EVs), Water Supply and Storage, Rail, Energy Storage, Warehouse, Government, Commercial, Automotive, Road, Manufacturing (Industrial), Residential, Metal
- Location
- Poland
- Updated
- 22 Jul 2026
- Source
- European Bank for Reconstruction and Development (EBRD)
ConstructChat
Ask ConstructChat about Clip Group Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | disbursing |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The EBRD (the "Bank") is providing a loan of approx. EUR 35 million of committed facility and potentially up to EUR 18 million of uncommitted term facility to CLIP Logistyka sp. z o.o., STS Logistic sp. z o.o. and CLIP Terminals sp. z o.o. (together, the "Borrowers"), part of CLIP Group S.A. (the "Group"), one of the largest privately owned logistics groups in Poland and the Central and Eastern Europe region. The Bank's financing is part of a broader syndicated senior financing package totalling up to EUR 342 million. The proceeds of the Bank's financing will be used to refinance existing indebtedness and support the Group's investment programme, including (i) development of an automotive terminal in Zabrze, (ii) construction of an intermodal container terminal, also in Zabrze, (iii) development of battery-charging infrastructure and energy storage systems, and potentially (iv) construction of new logistics halls. |
Original sector | Transport |
Budget |
Location
Country | Poland |
Source
Source | European Bank for Reconstruction and Development (EBRD) |
URL |
More Details
Record type | Project |
Sector | Electric Vehicles (EVs), Water Supply and Storage, Rail, Energy Storage, Warehouse, Government, Commercial, Automotive, Road, Manufacturing (Industrial), Residential, Metal |
Article published date | 2026-07-13 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Electric Vehicles (EVs) projects in Poland
- EV BATTERY GIGAFACTORY POLAND
- WARSAW BUS FLEET RENEWAL
- UMICORE EUROPEAN LARGE-SCALE BATTERY MATERIALS
- GREENWAY EV CHARGING NETWORK (EDP)
- Baltic Biking UPGRADE
- Connection of national Road – The Sucharski Route
- New tourist product — section of the trans-European cycle route EuroVelo 11 — continuation of the construction of the route in the villages Stará Źubovňa, Chmeľnica, Muszyna, Piwniczna-Zdroj, Rytro
- The Tool Supporting (r)Evolution In Forecasting and Optimizing Power Distribution Networks
