logo
ProjectClosed

CLOSED(T) POWER EFF IMPROVEMEN

The status, timeline and source of this project. A free account opens every field.

Source: World Bank Group

The project includes: a) rehabilitation of the 35 MW Trisuli and Devighat hydroelectric plants; b) reinforcement/upgrading of the existing transmission and distribution system in the Kathmandu valley, including provisions for spares, equipment and tools, as well as construction of a 132 kV interconnection with India to upgrade power exchange capabilities; c) provision of equipment for Nepal's Elec

Status
Closed
Sector
Road, Rail, Power Generation (CCGT), Hydro, Government
Location
Nepal
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about CLOSED(T) POWER EFF IMPROVEMEN

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “CLOSED(T) POWER EFF IMPROVEMEN” is an infrastructure initiative in the Road sector, located in Nepal. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The project includes: a) rehabilitation of the 35 MW Trisuli and Devighat hydroelectric plants; b) reinforcement/upgrading of the existing transmission and distribution system in the Kathmandu valley, including provisions for spares, equipment and tools, as well as construction of a 132 kV interconnection with India to upgrade power exchange capabilities; c) provision of equipment for Nepal's Electric Authority headquarters offices, a training centre and centrally located workshops; d) technical assistance to the Ministry of Industry to assist local industries in identifying energy conservation measures; and finally, e) implementation of the Marsyangdi Catchment Management Pilot Plan, which comprises: i) soil conservation and sediment control; ii) upgrading of the Dumre-Besisahar road; and lastly, iii) rural electrification in the Marsyangdi valley. Technical assistance in the form of consulting services to assist the Government of Nepal and the Nepal Electric Authority in implementation and training of Nepalese staff is provided with each project component as well as to improve the effectiveness of NEA's management, train higher level and support staff and improve billing.

Original sector

Energy and Extractives,Transportation

Budget

Location

Country

Nepal

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Road, Rail, Power Generation (CCGT), Hydro, Government

Article published date

2025-12-17

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project