CLOSED(T) POWER EFF IMPROVEMEN
The status, timeline and source of this project. A free account opens every field.
Source: World Bank Group
The project includes: a) rehabilitation of the 35 MW Trisuli and Devighat hydroelectric plants; b) reinforcement/upgrading of the existing transmission and distribution system in the Kathmandu valley, including provisions for spares, equipment and tools, as well as construction of a 132 kV interconnection with India to upgrade power exchange capabilities; c) provision of equipment for Nepal's Elec
- Status
- Closed
- Sector
- Road, Rail, Power Generation (CCGT), Hydro, Government
- Location
- Nepal
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about CLOSED(T) POWER EFF IMPROVEMEN
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project includes: a) rehabilitation of the 35 MW Trisuli and Devighat hydroelectric plants; b) reinforcement/upgrading of the existing transmission and distribution system in the Kathmandu valley, including provisions for spares, equipment and tools, as well as construction of a 132 kV interconnection with India to upgrade power exchange capabilities; c) provision of equipment for Nepal's Electric Authority headquarters offices, a training centre and centrally located workshops; d) technical assistance to the Ministry of Industry to assist local industries in identifying energy conservation measures; and finally, e) implementation of the Marsyangdi Catchment Management Pilot Plan, which comprises: i) soil conservation and sediment control; ii) upgrading of the Dumre-Besisahar road; and lastly, iii) rural electrification in the Marsyangdi valley. Technical assistance in the form of consulting services to assist the Government of Nepal and the Nepal Electric Authority in implementation and training of Nepalese staff is provided with each project component as well as to improve the effectiveness of NEA's management, train higher level and support staff and improve billing. |
Original sector | Energy and Extractives,Transportation |
Budget |
Location
Country | Nepal |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Road, Rail, Power Generation (CCGT), Hydro, Government |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Road projects in Nepal
- Himal Power Limited
- Kathmandu-Kulekhani-Hetauda Tunnel Highway
- Subregional Transport Facilitation (NEP)
- Upgrades to Gokuleswor-Thaktholi road
- Kathmandu-Terai Fast Track expressway project
- Nepal-India Electricity Transmission and Trade Project
- Upgrades to Chinchu (Pokhare)-Devisthal-Jajarkot road
- Hulaki highway
