Closure of Area B Landfill Phase B
Sector: Commercial • Location: Ringle, Wisconsin, United States of America
Source: Dodge USA
Include, in general, the following items: Mobilization Site preparation, erosion control and surface water drainage Construction of final waste grades and grading layer Compacted clay layer installation Geosynthetic surface preparation Rooting zone layer Topsoil installation Permanent stormwater conveyance and erosion control system construction General excavation and grading, trenching and backfi
- Status
- Closed
- Sector
- Commercial, Water Supply and Storage, Fertilizers, Government, Waste Processing and Treatment
- Location
- Ringle, Wisconsin, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Closure of Area B Landfill Phase B
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Include, in general, the following items: Mobilization Site preparation, erosion control and surface water drainage Construction of final waste grades and grading layer Compacted clay layer installation Geosynthetic surface preparation Rooting zone layer Topsoil installation Permanent stormwater conveyance and erosion control system construction General excavation and grading, trenching and backfilling Seeding, fertilizing, and mulching Welding of HDPE pipe for gas collection Installation of ... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Wisconsin |
City | Ringle |
Source
Source reliability | Medium |
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Commercial, Water Supply and Storage, Fertilizers, Government, Waste Processing and Treatment |
Article published date | 2024-01-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Commercial projects in United States of America
- SR 3/US 19 FROM 0.14 MI S OF SR 7 TO HENRY COUNTY LINE
- SR 150 FROM 0.18 MI S OF CR 14/STERLING WELLS ROAD TO SR 47
- SR 61 FM PAULDING COUNTY LINE TO N OF CR 522/OLD ALABAMA RD
- COMMERCIAL DRIVE IN STATHAM
- SR 21 FROM 0.02 MI S OF SR 30 TO 0.24 MI S OF NS 916917C
- SR 155 FROM JONESBORO ROAD TO DEKALB COUNTY LINE
- SR 400 @ CR 9284/WINDWARD PKWY
- SR 49 FROM BIBB COUNTY LINE TO BALDWIN COUNTY LINE
