logo
ProjectUnder Construction

Cloudbreak Battery Energy Storage System

The owner, status and timeline of this project. A free account opens every field.

Source: Energy-Storage.News

Fortescue has commenced construction on a 650MWh battery energy storage system at Cloudbreak in Western Australia’s Pilbara region, alongside the 690MW Turner River solar PV power plant.

Status
Under Construction
Sector
Energy Storage, Power Generation (CCGT), Solar, Power Transmission
Location
Pilbara, Western Australia, Australia
Updated
22 Jul 2026
Source
Energy-Storage.News

ConstructChat

Ask ConstructChat about Cloudbreak Battery Energy Storage System

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “Cloudbreak Battery Energy Storage System” is an infrastructure initiative in the Energy Storage sector, located in Pilbara, Western Australia, Australia. Taiyo aggregates data on it from Energy-Storage.News.

Participants

Not available for this record.

Status

Original status

under construction

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Fortescue has commenced construction on a 650MWh battery energy storage system at Cloudbreak in Western Australia’s Pilbara region, alongside the 690MW Turner River solar PV power plant.

Original sector

Energy

Location

Country

Australia

State

Western Australia

City

Pilbara

Source

Source

Energy-Storage.News

URL

More Details

Record type

Project

Sector

Energy Storage, Power Generation (CCGT), Solar, Power Transmission

Article published date

2026-05-28

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project