Cloudbreak Solar and Battery Energy Storage System
Sector: Metal • Location: Port Hedland, Western Australia, Australia
Source: Discovery Alert
A 190 MW solar photovoltaic farm co-located with a 74 MW / 650 MWh battery energy storage system at the Cloudbreak mine site. The battery system stores surplus solar energy during the day and dispatches it during low generation periods to maintain continuous power supply. Construction of the battery system commenced in 2026 and is targeted for completion in fiscal year 2027.
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | near completion |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | A 190 MW solar photovoltaic farm co-located with a 74 MW / 650 MWh battery energy storage system at the Cloudbreak mine site. The battery system stores surplus solar energy during the day and dispatches it during low generation periods to maintain continuous power supply. Construction of the battery system commenced in 2026 and is targeted for completion in fiscal year 2027. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
