Cloudbreak Solar Farm
Under construction · Western Australia · Last reported Apr 2025
Source: RenewEconomy
Fortescue Metals has begun construction of its largest solar farm, the 190 MW Cloudbreak solar project, which aims to eliminate fossil fuel use at its iron ore operations by the end of the decade. This project is part of a broader strategy to achieve 'real zero' emissions by 2030.
- Status
- Under Construction
- Sector
- Raw Materials, Power Generation (CCGT), Metal, Natural Gas, Solar, Steel
- Location
- Western Australia, Australia
- Updated
- 22 Jul 2026
- Source
- RenewEconomy
ConstructChat
Ask ConstructChat about Cloudbreak Solar Farm
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Under Construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Fortescue Metals has begun construction of its largest solar farm, the 190 MW Cloudbreak solar project, which aims to eliminate fossil fuel use at its iron ore operations by the end of the decade. This project is part of a broader strategy to achieve 'real zero' emissions by 2030. |
Original sector | Renewable Energy |
Location
Country | Australia |
State | Western Australia |
Source
Source | RenewEconomy |
URL |
More Details
Record type | Project |
Sector | Raw Materials, Power Generation (CCGT), Metal, Natural Gas, Solar, Steel |
Article published date | 2025-05-02 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
