Cloudbreak Solar Farm
Sector: Energy Storage • Location: Western Australia, Australia
Source: pv magazine Australia
Construction of a 190 MW solar farm at Fortescue's Cloudbreak site, part of the Pilbara Energy Connect project, currently almost halfway complete as of December 2025.
- Status
- Under Construction
- Sector
- Energy Storage, Solar, Raw Materials, Power Transmission, Power Generation (CCGT)
- Location
- Western Australia, Australia
- Updated
- 22 Jul 2026
- Source
- pv magazine Australia
ConstructChat
Ask ConstructChat about Cloudbreak Solar Farm
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | under construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Construction of a 190 MW solar farm at Fortescue's Cloudbreak site, part of the Pilbara Energy Connect project, currently almost halfway complete as of December 2025. |
Original sector | Utility Scale PV |
Location
Country | Australia |
State | Western Australia |
Source
Source | pv magazine Australia |
URL |
More Details
Record type | Project |
Sector | Energy Storage, Solar, Raw Materials, Power Transmission, Power Generation (CCGT) |
Article published date | 2025-12-03 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Energy Storage projects in Australia
- Kidston Pumped Storage Hydro Project Queensland Australia
- Wambo Wind Farm Australia
- Western Downs Green Power Hub Queensland
- Sapphire Windfarm New South Wales
- Wellington North Solar Project New South Wales Australia
- Energy Freedom Solar Electric Vehicle Pilot
- Kidston Pumped Hydro Energy Storage
- AGL Broken Hill Grid-Forming Battery
