CLOV Phase 3 Offshore Oil Project
Sector: Oil and Gas • Location: Angola
Source: Brazil Energy Insight
The CLOV Phase 3 project is a subsea tie-back development covering four deepwater oil fields: Cravo, Lirio, Orquidea, and Violeta. It leverages existing capacity on the FPSO CLOV to add production offshore Angola, contributing to a total of 60,000 barrels per day from the two projects.
- Status
- Under Construction
- Sector
- Oil and Gas
- Location
- Angola
- Updated
- 22 Jul 2026
- Source
- Brazil Energy Insight
ConstructChat
Ask ConstructChat about CLOV Phase 3 Offshore Oil Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | started production |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The CLOV Phase 3 project is a subsea tie-back development covering four deepwater oil fields: Cravo, Lirio, Orquidea, and Violeta. It leverages existing capacity on the FPSO CLOV to add production offshore Angola, contributing to a total of 60,000 barrels per day from the two projects. |
Original sector | Energy |
Location
Country | Angola |
Source
Source | Brazil Energy Insight |
URL |
More Details
Record type | Project |
Sector | Oil and Gas |
Article published date | 2025-09-16 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
