logo

CLOV Phase 3 Subsea Tie-Back Project

Sector: Oil and Gas • Location: Angola

Source: Offshore Engineer Magazine

Project
Completed

The CLOV Phase 3 project in Block 17 offshore Angola is operated by TotalEnergies with a 38% stake. It consists of four subsea wells tied back to the CLOV FPSO, producing 30,000 barrels per day.

Status
Closed
Sector
Oil and Gas, Government
Location
Angola
Updated
22 Jul 2026
Source
Offshore Engineer Magazine

ConstructChat

Ask ConstructChat about CLOV Phase 3 Subsea Tie-Back Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “CLOV Phase 3 Subsea Tie-Back Project” is an infrastructure initiative in the Oil and Gas sector, located in Angola. Taiyo aggregates data on it from Offshore Engineer Magazine.

Participants

Sponsoring Agency

Company

Status

Original status

completed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The CLOV Phase 3 project in Block 17 offshore Angola is operated by TotalEnergies with a 38% stake. It consists of four subsea wells tied back to the CLOV FPSO, producing 30,000 barrels per day.

Original sector

Oil and Gas

Location

Country

Angola

Source

Source

Offshore Engineer Magazine

URL

More Details

Record type

Project

Sector

Oil and Gas, Government

Article published date

2025-09-16

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project