logo

Clover Street School Field Improvements

Sector: Commercial • Location: Windsor, Connecticut, United States of America

Source: Dodge USA

Project
Bid Results

The CLOVER STREET FIELD IMPROVEMENTS project will consist of the regrading and reestablishment of natural turf athletic fields, installation of stormwater drainage systems, removal and replacement of existing building and utility connections, the installation of a bituminous concrete parking lot and other incidental construction items.

Status
Closed
Sector
Commercial, Cement, Power Transmission, Road, Car parking, Automotive, Government, Education, Power Generation (CCGT), Waste Processing and Treatment, Water Supply and Storage
Location
Windsor, Connecticut, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Clover Street School Field Improvements

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Clover Street School Field Improvements” is an infrastructure initiative in the Commercial sector, located in Windsor, Connecticut, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

Bid Results

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The CLOVER STREET FIELD IMPROVEMENTS project will consist of the regrading and reestablishment of natural turf athletic fields, installation of stormwater drainage systems, removal and replacement of existing building and utility connections, the installation of a bituminous concrete parking lot and other incidental construction items.

Procurement method

Budget

Location

Country

United States of America (USA)

State

Connecticut

City

Windsor

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Commercial, Cement, Power Transmission, Road, Car parking, Automotive, Government, Education, Power Generation (CCGT), Waste Processing and Treatment, Water Supply and Storage

Article published date

2024-07-01

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project