logo

CLP Guangxi Fangchenggang Power Company

Sector: Water Supply and Storage • Location: China

Source: World Bank Group

Project
Active

CLP Guangxi Fangchenggang Power Co., Ltd. was established on a 70:30 equity basis between China Light and Power Ltd. (CLP) and state-owned Guangxi Water & Power Engineering (Group) Co. Ltd. for the development and management of Guangxi Fangchenggang Power station in Guangxi Zhuang Autonomous Region.

First phase of the coal-fired power station, with a generating capacity of 1,200 MW (2 units wi

Project Information FAQ

Project Information

4 Q
The project “CLP Guangxi Fangchenggang Power Company” is an infrastructure initiative in the Water Supply and Storage sector, located in China. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

CLP Guangxi Fangchenggang Power Co., Ltd. was established on a 70:30 equity basis between China Light and Power Ltd. (CLP) and state-owned Guangxi Water & Power Engineering (Group) Co. Ltd. for the development and management of Guangxi Fangchenggang Power station in Guangxi Zhuang Autonomous Region. First phase of the coal-fired power station, with a generating capacity of 1,200 MW (2 units with 600 MW each), had an investment of US$ 664.5 million (RMB 5.5 billion). It was the largest foreign investment power project in the Guangxi Province. The project was jointly undertaken by CLP Power Asia Ltd. (CLP Power Asia), a wholly-owned subsidiary of private power company, CLP, and Guangxi Water and Power Engineering (Group) Co, Ltd.(Guangxi Water and Power), a subsidiary of state-owned Guangxi Electric power Co., Ltd., in which CLP Power Asia took a 70% interest and Guangxi Water and Power took a 30% interest separately. A domestic banking consortium on August 31 2005 agreed to grant loans worth US$ 500.18 million (RMB 4.14 billion) to the project. This consortium consisted of the Industrial and Commercial Bank of China, the Agricultural Bank of China and Bank of China Ltd. The three banks respectively provided US$ 186.06 million (RMB 1.54 billion), US$ 157.06 million (RMB 1.3 billion) and US$ 157.06 million (RMB 1.3 billion) to the project. Commercial operation for the first unit was to begin in the 2nd half of 2007 while 2nd unit was to start in early 2008. The site was located at a new coastal development site in Fangchenggang city, 190 km south of Nanning. Upon commissioning, it was to meet the local demand for electricity, as well as supplementing the power demand in nearby provinces.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data