logo

CLP (Jaisalmer) Windfarm 102.4MW

Sector: Wind • Location: India

Source: World Bank Group

Project
Active

In April 2012, CLP Group entered into an agreement with Rajasthan Government todevelop a 102.4MW wind farm located at Bhakrani in Jaisalmer district,in the state of Rajasthan.The project would be executed by CLP Wind Farms (India) Private Limited, the Group’s subsidiary in India. The wind farm will involve the building of 128 Enercon Gearless E53 wind turbines of 800KW capacity each. The electric

Project Information FAQ

Project Information

4 Q
The project “CLP (Jaisalmer) Windfarm 102.4MW” is an infrastructure initiative in the Wind sector, located in India. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

In April 2012, CLP Group entered into an agreement with Rajasthan Government todevelop a 102.4MW wind farm located at Bhakrani in Jaisalmer district,in the state of Rajasthan.The project would be executed by CLP Wind Farms (India) Private Limited, the Group’s subsidiary in India. The wind farm will involve the building of 128 Enercon Gearless E53 wind turbines of 800KW capacity each. The electricity generated from the project would be evacuated by the Rajasthan state grid. CLP India has entered into agreements with major wind turbine manufacturer, Enercon India Ltd to develop (including operation and maintenance of) these greenfield projects. The Bhakrani Wind farm was expected to sell the power to Rajasthan State Electricity Distribution Company (RVVNL), through a 25-year PPA signed on 1st July 2012.The APPC (Average Power Purchase Cost) base tariff as per RERC prevailing tariff order for Jaisalmer district was US$ 0.083/Unit (INR 4.46 per unit @ 53.44INR/USD) for the entire 25 years. The total capacity of 102.4 MW was eligible under REC as per the CERC and CDM benefits. Financial closure took place on 15th October 2012.The total project cost at the time of financial closure was US$ 120mn (INR 6412.8mn @ 53.44 INR/USD).The debt equity ratio for the project was about 67/33. Financing comprised of a US$ 80mn (INR 4275.2mn) Dollar Term loan and sponsor equity of US$ 40mn (INR 2137.6mn).The 12.5-year U.S. dollar proceeds were swapped back to Indian rupees to mitigate foreign exchange risk.The foreign currency loan was arranged by HSBC and Standard Chartered Bank. Construction for the wind farm started in July 2012 and was expected to be fully commissioned by March 2013. 21.6MW had already been commissioned by December 2012.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data