CLP (Jaisalmer) Windfarm 102.4MW
Sector: Wind • Location: India
Source: World Bank Group
In April 2012, CLP Group entered into an agreement with Rajasthan Government todevelop a 102.4MW wind farm located at Bhakrani in Jaisalmer district,in the state of Rajasthan.The project would be executed by CLP Wind Farms (India) Private Limited, the Group’s subsidiary in India. The wind farm will involve the building of 128 Enercon Gearless E53 wind turbines of 800KW capacity each. The electric
- Status
- Prospective
- Sector
- Wind, Raw Materials, Power Generation (CCGT), Government, Manufacturing (Industrial), Commercial
- Location
- India
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about CLP (Jaisalmer) Windfarm 102.4MW
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | In April 2012, CLP Group entered into an agreement with Rajasthan Government todevelop a 102.4MW wind farm located at Bhakrani in Jaisalmer district,in the state of Rajasthan.The project would be executed by CLP Wind Farms (India) Private Limited, the Group’s subsidiary in India. The wind farm will involve the building of 128 Enercon Gearless E53 wind turbines of 800KW capacity each. The electricity generated from the project would be evacuated by the Rajasthan state grid. CLP India has entered into agreements with major wind turbine manufacturer, Enercon India Ltd to develop (including operation and maintenance of) these greenfield projects. The Bhakrani Wind farm was expected to sell the power to Rajasthan State Electricity Distribution Company (RVVNL), through a 25-year PPA signed on 1st July 2012.The APPC (Average Power Purchase Cost) base tariff as per RERC prevailing tariff order for Jaisalmer district was US$ 0.083/Unit (INR 4.46 per unit @ 53.44INR/USD) for the entire 25 years. The total capacity of 102.4 MW was eligible under REC as per the CERC and CDM benefits. Financial closure took place on 15th October 2012.The total project cost at the time of financial closure was US$ 120mn (INR 6412.8mn @ 53.44 INR/USD).The debt equity ratio for the project was about 67/33. Financing comprised of a US$ 80mn (INR 4275.2mn) Dollar Term loan and sponsor equity of US$ 40mn (INR 2137.6mn).The 12.5-year U.S. dollar proceeds were swapped back to Indian rupees to mitigate foreign exchange risk.The foreign currency loan was arranged by HSBC and Standard Chartered Bank. Construction for the wind farm started in July 2012 and was expected to be fully commissioned by March 2013. 21.6MW had already been commissioned by December 2012. |
Original sector | Energy |
Budget |
Location
Country | India |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Wind, Raw Materials, Power Generation (CCGT), Government, Manufacturing (Industrial), Commercial |
Article published date | 2024-10-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Wind projects in India
- Mundra Power Plant Gujarat
- Vallur Conventional 1000MW Thermal Power Plant India
- Tapovan Vishnugad Hydroelectric Power Plant Uttarakhand
- Dabhol Power Plant Ratnagiri District Maharashtra India
- Tamil Nadu Wind Farm
- Tiroda Super Critical Thermal Power Plant Maharashtra
- Polavaram Hydro Electric Project Andhra Pradesh
- East Coast Energy Private Limited (ECEPL)