Clypse Reservoir Valve Replacement Project
The owner, status and timeline of this project. A free account opens every field.
Source: Manx Radio
A project involving the replacement of two critical valves at the Clypse Reservoir in Onchan, Isle of Man. The facility was emptied to carry out the work, and a new pressure sensor was installed to provide real-time water level data to the Manx Utilities control system. The project was completed on time and on budget.
- Status
- Closed
- Sector
- Advanced Electronics, Water Supply and Storage, Government
- Location
- Onchan, South Korea
- Updated
- 22 Jul 2026
- Source
- Manx Radio
ConstructChat
Ask ConstructChat about Clypse Reservoir Valve Replacement Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | A project involving the replacement of two critical valves at the Clypse Reservoir in Onchan, Isle of Man. The facility was emptied to carry out the work, and a new pressure sensor was installed to provide real-time water level data to the Manx Utilities control system. The project was completed on time and on budget. |
Original sector | Water Infrastructure |
Location
Country | South Korea |
City | Onchan |
Source
Source | Manx Radio |
URL |
More Details
Record type | Project |
Sector | Advanced Electronics, Water Supply and Storage, Government |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
