ProjectClosed

CM - Lom Pangar Hydropower Proj. (FY12)

Sector: Road • Location: Cameroon

Source: World Bank

The development objective of the Lom Pangar Hydropower Project for Cameroon is to increase hydropower generation capacity and reduce seasonal variability of water flow in the Sanaga River and to increase access to electricity. There are four components to the project. The first component is Lom Pangar regulating dam. This component will co-finance the construction of the Lom Pangar regulating dam

Status
Closed
Sector
Road, Water Supply and Storage, Power Generation (CCGT), Hydro, Forest Products and Packaging, Government
Location
Cameroon
Updated
22 Jul 2026
Source
World Bank

ConstructChat

Ask ConstructChat about CM - Lom Pangar Hydropower Proj. (FY12)

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “CM - Lom Pangar Hydropower Proj. (FY12)” is an infrastructure initiative in the Road sector, located in Cameroon. Taiyo aggregates data on it from World Bank.

Participants

Sponsoring Agency

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The development objective of the Lom Pangar Hydropower Project for Cameroon is to increase hydropower generation capacity and reduce seasonal variability of water flow in the Sanaga River and to increase access to electricity. There are four components to the project. The first component is Lom Pangar regulating dam. This component will co-finance the construction of the Lom Pangar regulating dam on the Lom River. Based on the engineering design, the dam will be 46 meters high and 7 meters wide at the crest and be composed of a central overflow section with embankment wings and a saddle dam. The second component is Lom Pangar Power Plant and Transmission Line. A 30 MW hydropower plant consisting of four Francis turbines will be constructed at the foot of the dam. The power plant will be connected through a 105 kilometer 90 kV transmission line to the existing Eastern Network at Bertoua. A HV/MV substation will be constructed in Bertoua. This component will also include a rural electrification sub-component to connect 13 localities between the hydropower plant and Bertoua and the electrification of approximately 2,400 households12. It will also include social mitigation measures related to the power plant and transmission line. The third component is environmental and social measures. This component is comprised of eight sub-components: six sub-components linked to the Environmental and Social Management Plan (ESMP), a sub-component on the Resettlement Action Plans (RAPs) and a local development sub-component. The fourth component is technical assistance and project management. This component is composed of three sub components: i) technical assistance, ii) communications, and iii) project management.

Original sector

FY17 - Energy and Extractives,FY17 - Health,FY17 - Social Protection,FY17 - Transportation

Budget

Location

Country

Cameroon

Source

Source

World Bank

URL

More Details

Record type

Project

Sector

Road, Water Supply and Storage, Power Generation (CCGT), Hydro, Forest Products and Packaging, Government

Article published date

2025-12-15

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project