CMC-PUN Flow Control Improvements
Closed · British Columbia · Last reported Jul 2023
Source: Dodge USA
The purpose of this Request for Proposal (RFP) is to invite the interested parties to submit proposals for the construction works required for the flow control improvements at the Comox Dam, the Puntledge Dam and Penstock, and the Puntledge Powerhouse near Courtenay, B.C. The work within this project includes refurbishment and upgrade of several key assets to improve reliability and public safety
- Status
- Closed
- Sector
- Hydro, Commercial, Manufacturing (Industrial), Water Supply and Storage
- Location
- Vancouver, British Columbia, Canada
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about CMC-PUN Flow Control Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The purpose of this Request for Proposal (RFP) is to invite the interested parties to submit proposals for the construction works required for the flow control improvements at the Comox Dam, the Puntledge Dam and Penstock, and the Puntledge Powerhouse near Courtenay, B.C. The work within this project includes refurbishment and upgrade of several key assets to improve reliability and public safety of the flow control equipment associated with the Puntledge Generating Station. This involves wor... |
Procurement method | |
Budget |
Location
Country | Canada |
State | British Columbia |
City | Vancouver |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Hydro, Commercial, Manufacturing (Industrial), Water Supply and Storage |
Article published date | 2024-02-22 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Hydro projects in Canada
- Suncor Millennium Naptha Unit and Hydrogen Plant
- Residue Storage Areas and Dams
- Ligne à 120 kV du Grand-Brûlé–Dérivation Saint-Sauveur
- Modernisation du réseau de l’Estrie
- Projets et travaux de construction
- Poste d’Argenteuil à 315‑120‑25 kV et lignes d’alimentation
- Projet de déclassement de la centrale de Gentilly-2
- La Vérendrye-Parent
