CMIS Basin H PCB Remediation and Rehabilitation
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
The purpose of the project is to reduce the risk of a sanitary sewer overflow due to the failure of the Basin H MIS and provide a cost-effective service life of an additional 50 years or more. The project scope is to design and implement rehabilitation of the MIS located in Basin H of the Central MIS sewer system. The MIS runs roughly adjacent to the Milwaukee River from Auer Avenue to Hampton Ave
- Status
- Closed
- Sector
- Commercial, Water Supply and Storage, Road, Waste Processing and Treatment, Government, Hospital, Hotel, Manufacturing (Industrial)
- Location
- Milwaukee, Wisconsin, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about CMIS Basin H PCB Remediation and Rehabilitation
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The purpose of the project is to reduce the risk of a sanitary sewer overflow due to the failure of the Basin H MIS and provide a cost-effective service life of an additional 50 years or more. The project scope is to design and implement rehabilitation of the MIS located in Basin H of the Central MIS sewer system. The MIS runs roughly adjacent to the Milwaukee River from Auer Avenue to Hampton Avenue northward and from Auer Avenue to Milwaukee Street southward. This project includes removing ... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Wisconsin |
City | Milwaukee |
Source
Source reliability | Medium |
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Commercial, Water Supply and Storage, Road, Waste Processing and Treatment, Government, Hospital, Hotel, Manufacturing (Industrial) |
Article published date | 2024-01-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Commercial projects in United States of America
- SR 3/US 19 FROM 0.14 MI S OF SR 7 TO HENRY COUNTY LINE
- SR 150 FROM 0.18 MI S OF CR 14/STERLING WELLS ROAD TO SR 47
- SR 61 FM PAULDING COUNTY LINE TO N OF CR 522/OLD ALABAMA RD
- COMMERCIAL DRIVE IN STATHAM
- SR 21 FROM 0.02 MI S OF SR 30 TO 0.24 MI S OF NS 916917C
- SR 155 FROM JONESBORO ROAD TO DEKALB COUNTY LINE
- SR 400 @ CR 9284/WINDWARD PKWY
- SR 49 FROM BIBB COUNTY LINE TO BALDWIN COUNTY LINE
