CMP Storm Pipe Replacement
Sector: Water Supply and Storage • Location: Kerrville, Texas, United States of America
Source: Dodge USA
- The project consists of: a. INSTALLATION OF EROSION CONTROL MEASURES b. HMAC AND PCC PAVEMENT REMOVAL c. EXISTING CMP AND SET REMOVAL d. INSTALLATION OF DUAL 24" CLASS III RCP AND SET e. TIE RCP INTO EXISTING STORM INLET f. REGRADING OF EXISTING CHANNEL TO ACCOMMODATE RCP EXTENSION g. INSTALLATION OF HMAC AND PCC PAVEMENT SECTION ABOVE NEW RCP h. VEGETATION ESTABLISHMENT i. - CENTERLINE STRIPIN
- Status
- Closed
- Sector
- Water Supply and Storage, Consumer Products, Airport, Commercial, Road, Government, Waste Processing and Treatment
- Location
- Kerrville, Texas, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about CMP Storm Pipe Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | 1. The project consists of: a. INSTALLATION OF EROSION CONTROL MEASURES b. HMAC AND PCC PAVEMENT REMOVAL c. EXISTING CMP AND SET REMOVAL d. INSTALLATION OF DUAL 24" CLASS III RCP AND SET e. TIE RCP INTO EXISTING STORM INLET f. REGRADING OF EXISTING CHANNEL TO ACCOMMODATE RCP EXTENSION g. INSTALLATION OF HMAC AND PCC PAVEMENT SECTION ABOVE NEW RCP h. VEGETATION ESTABLISHMENT i. - CENTERLINE STRIPING SHALL BE INSTALLED AFTER CURE PERIOD OF HMAC HAS BEEN MET PER P-620 2. The Contractor shall pro... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Texas |
City | Kerrville |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Consumer Products, Airport, Commercial, Road, Government, Waste Processing and Treatment |
Article published date | 2024-11-04 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
