CMP Storm Pipe Replacement
Sector: Water Supply and Storage • Location: Kerrville, Texas, United States of America
Source: Dodge
- The project consists of: a. INSTALLATION OF EROSION CONTROL MEASURES b. HMAC AND PCC PAVEMENT REMOVAL c. EXISTING CMP AND SET REMOVAL d. INSTALLATION OF DUAL 24" CLASS III RCP AND SET e. TIE RCP INTO EXISTING STORM INLET f. REGRADING OF EXISTING CHANNEL TO ACCOMMODATE RCP EXTENSION g. INSTALLATION OF HMAC AND PCC PAVEMENT SECTION ABOVE NEW RCP h. VEGETATION ESTABLISHMENT i. - CENTERLINE STRIPIN
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | Bid Results |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | 1. The project consists of: a. INSTALLATION OF EROSION CONTROL MEASURES b. HMAC AND PCC PAVEMENT REMOVAL c. EXISTING CMP AND SET REMOVAL d. INSTALLATION OF DUAL 24" CLASS III RCP AND SET e. TIE RCP INTO EXISTING STORM INLET f. REGRADING OF EXISTING CHANNEL TO ACCOMMODATE RCP EXTENSION g. INSTALLATION OF HMAC AND PCC PAVEMENT SECTION ABOVE NEW RCP h. VEGETATION ESTABLISHMENT i. - CENTERLINE STRIPING SHALL BE INSTALLED AFTER CURE PERIOD OF HMAC HAS BEEN MET PER P-620 2. The Contractor shall pro... |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
More Water Supply and Storage projects in United States of America
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
- KITCEHN REMODEL, REPLACE CABINETS, WATER AND WASTE LINES REDIRECTED, NEW ELECTRICAL LINES FROM MAIN PANEL
- LAFCO PROCESS FOR NEW WATER CONNECTION ON COH WATER SERVICE
- BUILDING (A): MANUFACTURING/MANUFACTURING SUPPORT SPACE, BOILER REPLACE, WATER PURIFICATION SYSTEM, HVAC, 652 SF MAIN
