logo

CMRL Phase 2 Longest Tunnel Completion

Sector: Mass Transit • Location: Chennai, Tamil Nadu, India

Source: The New Indian Express

Project
Completed

The Chennai Metro Rail Limited (CMRL) achieved a major engineering milestone with the successful retrieval of tunnel boring machine 'Peacock' at the Kodambakkam ramp near Meenakshi College, completing the longest underground tunnel work of its Phase 2 drive without public disruption. The 2.047-km bored tunnel is part of Corridor 4, a 26.8 km stretch linking Light House and Poonamallee Bypass. The

Project Information FAQ

Project Information

4 Q
The project “CMRL Phase 2 Longest Tunnel Completion” is an infrastructure initiative in the Mass Transit sector, located in Chennai, Tamil Nadu, India. Taiyo aggregates data on it from The New Indian Express.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

completed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Chennai Metro Rail Limited (CMRL) achieved a major engineering milestone with the successful retrieval of tunnel boring machine 'Peacock' at the Kodambakkam ramp near Meenakshi College, completing the longest underground tunnel work of its Phase 2 drive without public disruption. The 2.047-km bored tunnel is part of Corridor 4, a 26.8 km stretch linking Light House and Poonamallee Bypass. The TBM was launched in May 2024 from Panagal Park crossover and traversed densely built residential areas, passing under more than 190 buildings, including over 50 ageing structures, and two churches, while boring parallel to an active railway line before crossing multiple tracks. No damage or disturbance was reported during the excavation, marking the completion of the single longest tunnel in Phase 2.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data