CN - XIAOLANGDI MULTI. II
The status, timeline and source of this project. A free account opens every field.
Source: World Bank Group
The objectives of the Xiaolangdi Multipurpose Project: Stage II are to: 1) provide flood protection for 103 million people in the North China Plain in rural areas, several large and medium cities and major industrial centers; 2) control sediment accretion in the lower reach of the Yellow River for a period of about 20 years; 3) generate much needed hydropower; and 4) supply irrigation water (and
- Status
- Closed
- Sector
- Water Supply and Storage, Power Generation (CCGT), Manufacturing (Industrial), Hydro, Government
- Location
- China
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about CN - XIAOLANGDI MULTI. II
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The objectives of the Xiaolangdi Multipurpose Project: Stage II are to: 1) provide flood protection for 103 million people in the North China Plain in rural areas, several large and medium cities and major industrial centers; 2) control sediment accretion in the lower reach of the Yellow River for a period of about 20 years; 3) generate much needed hydropower; and 4) supply irrigation water (and increase the reliability of irrigation) for some 2 million hectares and ensure more stable water supplies for downstream cities and industries. The components of the projects are the following: (i) dam and structures, which include preliminary-local works, dam, inlet, outlet, power station, turbines, gates, metalwork, generators, switchyard, contract administration and consulting services; (ii) training; (iii) environmental management plan; (iii) flood, sediment, ice and drought management; (iv) institutional support for the Yellow River Conservancy Commission; and (v) institutional reform training. |
Original sector | Energy and Extractives,FY17 - Public Administration |
Budget |
Location
Country | China |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Power Generation (CCGT), Manufacturing (Industrial), Hydro, Government |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in China
- Yangjiang Nuclear Power Plant Guangdong Province
- Shidao Bay Nuclear Power Plant
- Sanmen Nuclear Power Plant Zhejiang Province
- Baihetan Hydropower Project China
- The Ertan China Hydropower Plant Project
- Yebatan Hydropower Project
- Qinshan Nuclear Power Plant Haiyan County Zhejiang
- Lingao Nuclear Power Station Guangdong
