CN-E. China (Jiangsu) Power Transmission
Sector: Power Generation (CCGT) • Location: China
Source: World Bank Group
The East China (Jiangsu) Power Transmission Project aims at alleviating critical bottlenecks in power transmission infrastructure and increasing electricity trade on a commercial basis in the East China region. The project components are as follows: a) System expansion covers the planning, design, supply, and construction of approximately 993 km of 500 kV (kilowatt) transmission lines; the constr
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The East China (Jiangsu) Power Transmission Project aims at alleviating critical bottlenecks in power transmission infrastructure and increasing electricity trade on a commercial basis in the East China region. The project components are as follows: a) System expansion covers the planning, design, supply, and construction of approximately 993 km of 500 kV (kilowatt) transmission lines; the construction of five new 500 kV substations and the expansion of two existing 500 kV ones; and the reinforcement of Nanjing's urban transmission system. b) Implementation assistance will support local and international consulting services for engineering and construction management. c) Technical assistance for improved interprovincial power exchange policies and procedures will develop an incentive framework and institutional basis for resource pooling and efficient power trading between provincial systems. d) Technical assistance for improved accounting and financial management systems will support cost accounting, performance evaluation, and financial planning. e) Institutional development and training will provide training programs, and support the procurement and installation of required hardware and software for power system analysis. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
