logo

CN-Tianhuangping Hydroelectric Project

Sector: Water Supply and Storage • Location: China

Source: World Bank Group

Project
Closed

The main objectives of the project are to: (a) alleviate an acute shortage of peaking power and enable more efficient use of power plants in a predominantly coal-fired thermal power system by transferring off-peak energy to peak energy with construction of the cost-effective and environmentally sound Tianhuangping pumped-storage hydroelectric plant and associated facilities; (b) support economic

Project Information FAQ

Project Information

5 Q
The project “CN-Tianhuangping Hydroelectric Project” is an infrastructure initiative in the Water Supply and Storage sector, located in China. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The main objectives of the project are to: (a) alleviate an acute shortage of peaking power and enable more efficient use of power plants in a predominantly coal-fired thermal power system by transferring off-peak energy to peak energy with construction of the cost-effective and environmentally sound Tianhuangping pumped-storage hydroelectric plant and associated facilities; (b) support economic reform and provide an enabling environment for attracting foreign investments and promoting private sector development by improving the quality of the power supply and enhancing socioeconomic conditions in the densely populated East China region; (c) improve load management and promote energy conservation by introducing appropriate power pricing; (d) support institutional development of the beneficiary by strengthening its organization through an advanced management and staff training program; (e) contribute to the development of an improved power utility regulatory framework; (f) assist in transferring new power technologies for what will be the largest pumped-storage hydroelectric plant in China, and in applying modern power system operation optimization methods; and (g) extend technical assitance in project design and implementation, and in promoting prudent financial management. The project consists of: (i) construction of a pumped-storage hydroelectric power plant together with upper and lower reservoirs, a water conveyance system, an underground powerhouse, and a switchyard; (ii) provision and installation of six 300-MW reversible pump-turbine units and associated equipment; (iii) erection of 500-kV transmission lines and reinforcement of the existing power transmission network; (iv) construction management and engineering services; (iv) studies of optimal power plant operation and its output pricing; and (v) strengthening of the beneficiary's organization through the provision of technical assistance and training.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data