logo
ProjectClosed

CN-Tianhuangping Hydroelectric Project

Sector: Water Supply and Storage • Location: China

Source: World Bank Group

The main objectives of the project are to: (a) alleviate an acute shortage of peaking power and enable more efficient use of power plants in a predominantly coal-fired thermal power system by transferring off-peak energy to peak energy with construction of the cost-effective and environmentally sound Tianhuangping pumped-storage hydroelectric plant and associated facilities; (b) support economic

Status
Closed
Sector
Water Supply and Storage, Power Transmission, Waste Processing and Treatment, Wind, Geothermal, Power Generation (CCGT), Hydro, Government
Location
China
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about CN-Tianhuangping Hydroelectric Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “CN-Tianhuangping Hydroelectric Project” is an infrastructure initiative in the Water Supply and Storage sector, located in China. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The main objectives of the project are to: (a) alleviate an acute shortage of peaking power and enable more efficient use of power plants in a predominantly coal-fired thermal power system by transferring off-peak energy to peak energy with construction of the cost-effective and environmentally sound Tianhuangping pumped-storage hydroelectric plant and associated facilities; (b) support economic reform and provide an enabling environment for attracting foreign investments and promoting private sector development by improving the quality of the power supply and enhancing socioeconomic conditions in the densely populated East China region; (c) improve load management and promote energy conservation by introducing appropriate power pricing; (d) support institutional development of the beneficiary by strengthening its organization through an advanced management and staff training program; (e) contribute to the development of an improved power utility regulatory framework; (f) assist in transferring new power technologies for what will be the largest pumped-storage hydroelectric plant in China, and in applying modern power system operation optimization methods; and (g) extend technical assitance in project design and implementation, and in promoting prudent financial management. The project consists of: (i) construction of a pumped-storage hydroelectric power plant together with upper and lower reservoirs, a water conveyance system, an underground powerhouse, and a switchyard; (ii) provision and installation of six 300-MW reversible pump-turbine units and associated equipment; (iii) erection of 500-kV transmission lines and reinforcement of the existing power transmission network; (iv) construction management and engineering services; (iv) studies of optimal power plant operation and its output pricing; and (v) strengthening of the beneficiary's organization through the provision of technical assistance and training.

Original sector

Energy and Extractives,FY17 - Public Administration,FY17 - Transportation,FY17 - Water, Sanitation and Waste Management

Budget

Location

Country

China

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Power Transmission, Waste Processing and Treatment, Wind, Geothermal, Power Generation (CCGT), Hydro, Government

Article published date

2025-12-17

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project