CN-Yangzhou Thermal Power
The status, timeline and source of this project. A free account opens every field.
Source: World Bank Group
The main objectives of the Yangzhou Thermal Power Project are to: (a) support power subsector reforms at the provincial level, through development of Jiangsu Provincial Electric Power Company (JPEPC) as an autonomous company; (b) contribute to further rationalization of power tariffs; (c) promote the use of modern financial management techniques in transforming JPEPC's accounting system; (d) provi
- Status
- Closed
- Sector
- Power Transmission, Geothermal, Power Generation (CCGT), Government
- Location
- China
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about CN-Yangzhou Thermal Power
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The main objectives of the Yangzhou Thermal Power Project are to: (a) support power subsector reforms at the provincial level, through development of Jiangsu Provincial Electric Power Company (JPEPC) as an autonomous company; (b) contribute to further rationalization of power tariffs; (c) promote the use of modern financial management techniques in transforming JPEPC's accounting system; (d) provide cost-effective and environmentally sustainable generation capacity to alleviate an acute shortage of power and improve the quality of the power supply; (e) assist in transferring modern technologies for large coal-fired power plants, and in strengthening institutional capabilities for environmental management and monitoring; and (f) extend technical assistance in management development and staff training program. The project consists of: (a) construction of a coal-fired thermal power plant with two 600-MW generating units and associated equipment; (b) erection of two 500-kV transmission lines (about 30 km long) and reinforcement of the existing power transmission network; (c) provision of engineering and construction management services; (d) extension of technical assistance for the development and implementation of improved accounting and financial management information systems; (e) carrying out of environmental management and resettlement programs; and (f) undertaking of management development and staff training. |
Original sector | Energy and Extractives,FY17 - Public Administration |
Budget |
Location
Country | China |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Power Transmission, Geothermal, Power Generation (CCGT), Government |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Transmission projects in China
- The Ertan China Hydropower Plant Project
- Liaoyang City Recycled Water Supply
- Wuhan City Dongxi Lake District Wastewater Collection System
- Hangzhou - Shaoxing - Taizhou Railway
- Liuzhou Water Services
- Changshu Water Supply Company Ltd.
- Hegang Sanli Water Affairs Company Limited
- Dali Eryuan County Urban and Rural Watewater Utilities Project
