CN-Yangzhou Thermal Power
Sector: Power Transmission • Location: China
Source: World Bank Group
The main objectives of the Yangzhou Thermal Power Project are to: (a) support power subsector reforms at the provincial level, through development of Jiangsu Provincial Electric Power Company (JPEPC) as an autonomous company; (b) contribute to further rationalization of power tariffs; (c) promote the use of modern financial management techniques in transforming JPEPC's accounting system; (d) provi
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The main objectives of the Yangzhou Thermal Power Project are to: (a) support power subsector reforms at the provincial level, through development of Jiangsu Provincial Electric Power Company (JPEPC) as an autonomous company; (b) contribute to further rationalization of power tariffs; (c) promote the use of modern financial management techniques in transforming JPEPC's accounting system; (d) provide cost-effective and environmentally sustainable generation capacity to alleviate an acute shortage of power and improve the quality of the power supply; (e) assist in transferring modern technologies for large coal-fired power plants, and in strengthening institutional capabilities for environmental management and monitoring; and (f) extend technical assistance in management development and staff training program. The project consists of: (a) construction of a coal-fired thermal power plant with two 600-MW generating units and associated equipment; (b) erection of two 500-kV transmission lines (about 30 km long) and reinforcement of the existing power transmission network; (c) provision of engineering and construction management services; (d) extension of technical assistance for the development and implementation of improved accounting and financial management information systems; (e) carrying out of environmental management and resettlement programs; and (f) undertaking of management development and staff training. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
More Power Transmission projects in China
- Tianwan Nuclear Power Plant Lianyungang
- Liaoyang City River East New City Water Affairs Project
- Wengeng Buyuan Water System Connectivity Project
- JHL Biotech Biosimilars Manufacturing Facility, Wuhan, China
- Daiichi Sankyo Company, Pharmaceutical Plant, Beijing, China
- Novartis Pharmaceutical Development Centre
- Tung Chung Sewage Treatment Plant and supporting infrastructure upgrade
- Water supply plant and supporting pipe network project in Qinglong County
