logo
ProjectClosed

CN-Yangzhou Thermal Power

The status, timeline and source of this project. A free account opens every field.

Source: World Bank Group

The main objectives of the Yangzhou Thermal Power Project are to: (a) support power subsector reforms at the provincial level, through development of Jiangsu Provincial Electric Power Company (JPEPC) as an autonomous company; (b) contribute to further rationalization of power tariffs; (c) promote the use of modern financial management techniques in transforming JPEPC's accounting system; (d) provi

Status
Closed
Sector
Power Transmission, Geothermal, Power Generation (CCGT), Government
Location
China
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about CN-Yangzhou Thermal Power

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “CN-Yangzhou Thermal Power” is an infrastructure initiative in the Power Transmission sector, located in China. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The main objectives of the Yangzhou Thermal Power Project are to: (a) support power subsector reforms at the provincial level, through development of Jiangsu Provincial Electric Power Company (JPEPC) as an autonomous company; (b) contribute to further rationalization of power tariffs; (c) promote the use of modern financial management techniques in transforming JPEPC's accounting system; (d) provide cost-effective and environmentally sustainable generation capacity to alleviate an acute shortage of power and improve the quality of the power supply; (e) assist in transferring modern technologies for large coal-fired power plants, and in strengthening institutional capabilities for environmental management and monitoring; and (f) extend technical assistance in management development and staff training program. The project consists of: (a) construction of a coal-fired thermal power plant with two 600-MW generating units and associated equipment; (b) erection of two 500-kV transmission lines (about 30 km long) and reinforcement of the existing power transmission network; (c) provision of engineering and construction management services; (d) extension of technical assistance for the development and implementation of improved accounting and financial management information systems; (e) carrying out of environmental management and resettlement programs; and (f) undertaking of management development and staff training.

Original sector

Energy and Extractives,FY17 - Public Administration

Budget

Location

Country

China

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Power Transmission, Geothermal, Power Generation (CCGT), Government

Article published date

2025-12-17

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project