logo

CN-ZHEJIANG POWER DEVT

Sector: Power Transmission • Location: China

Source: World Bank Group

Project
Closed

The objectives of the Zhejiang Power Development Project are to: 1) help meet rapidly expanding electricity demand in Zhejiang Province in a least-cost manner; 2) promote power sector reform including commercialization and corporatization of the provincial power enterprise; 3) upgrade management capabilities and systems to enable the enterprise to operate efficiently in a commercial environment; 4

Project Information FAQ

Project Information

5 Q
The project “CN-ZHEJIANG POWER DEVT” is an infrastructure initiative in the Power Transmission sector, located in China. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The objectives of the Zhejiang Power Development Project are to: 1) help meet rapidly expanding electricity demand in Zhejiang Province in a least-cost manner; 2) promote power sector reform including commercialization and corporatization of the provincial power enterprise; 3) upgrade management capabilities and systems to enable the enterprise to operate efficiently in a commercial environment; 4) promote competition at the generation level through establishment of market-oriented commercial arrangements between power generation and marketing entities; 5) encourage alternative financing strategies for power development; 6) improve supply side-efficiency through reduction of transmission and distribution losses; and 7) reduce environmental impacts of new generation. The project will include power sector reform, investment and institutional development components as follows: 1) a time-bound implementation plan for power sector reform, including commercialization and incorporation of the power company; 2) Beilungang Phase 2 consisting of the addition of three 600-MW coal-fired units at the Beilungang Power Station; 3) transmission network expansion and reinforcement by the addition of about 400 circuit-km of 500 kV transmission lines and 2,250 of 500 kV substations; 4) reinforcement of distribution networks in Hangzhou and Ningbo Municipalities; 5) engineering and construction management services for Beilungang Phase 2; 6) technical assistance in preparing the security package for the Wangjiangmen cogeneration plant, which will be developed by a foreign/local joint venture; and 7) technical assistance to assist in commercialization, establish a computerized financial managment information system (FMIS), improve transmission and distribution planning, upgrade environmental monitoring, and support ZPEPC training program.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data